25-10-2013, 04:09 PM
So this "weekends" work has finally finished this morning when swapped the last hoses and put on new hand brake cables.
Didn't wash her in the end, just CBA but might do it at some point during the week (along with finishing getting the BMW seats in).
So a list of whats been done:
GTi6 rear beam lowered 40mm (goes 60mm on the car as the 6 beam is 20mm lower anyway)
Braided hoses all round
Mintex pads and discs
Bleed through with dot 5.1 fluid
New hand brake cables
Mid box back box conversion
Removed spare wheel and carrier
New pair of Bridgestone Turanzas on the front
Waxoyled everything from the fuel tank back
Grille sprayed white
And a couple of pics
Didn't wash her in the end, just CBA but might do it at some point during the week (along with finishing getting the BMW seats in).
So a list of whats been done:
GTi6 rear beam lowered 40mm (goes 60mm on the car as the 6 beam is 20mm lower anyway)
Braided hoses all round
Mintex pads and discs
Bleed through with dot 5.1 fluid
New hand brake cables
Mid box back box conversion
Removed spare wheel and carrier
New pair of Bridgestone Turanzas on the front
Waxoyled everything from the fuel tank back
Grille sprayed white
And a couple of pics