So very little has happened this week with the zx, but these gauges arrived to a made a template up to hold them.
Then spent hours trying to get though the bulk head in to car to run pipe/wire for them. Ended up with dash all in bits.
Also fitted the new glow plugs and a new thermostat. The fuel pump arrived back from darren I've filled it full with diesel and it's sat in the car waiting to be fitted.
That's about if for now. I've bought some arp head studs, and getting some forged rods for it, think I'll buy another engine to build up tho rather than take this one to bits.
Hoping to have a big push this weekend to get the welding done and pump on get it up and running again. I start a new job on the lorry's next week so my time is gonna be very limited to get things done so hoping I can get 90% done this weekend.
Then spent hours trying to get though the bulk head in to car to run pipe/wire for them. Ended up with dash all in bits.
Also fitted the new glow plugs and a new thermostat. The fuel pump arrived back from darren I've filled it full with diesel and it's sat in the car waiting to be fitted.
That's about if for now. I've bought some arp head studs, and getting some forged rods for it, think I'll buy another engine to build up tho rather than take this one to bits.
Hoping to have a big push this weekend to get the welding done and pump on get it up and running again. I start a new job on the lorry's next week so my time is gonna be very limited to get things done so hoping I can get 90% done this weekend.