19-03-2012, 08:31 PM
i sent mine to the body shop. he said he plastic welded a peice of old bumper (same sort of plastic). as for the swage lines holes were drilled, p40 then p38. hole lot coast me £300 cash. as said before, their are a couple of ways of doing it as long as you dont just pack with p38 (as it will crack and prooberly fall out in the first month) then its just down to how good a job you do. good luck with it whatever you do.