21-11-2013, 03:12 PM
(This post was last modified: 21-11-2013, 03:18 PM by JJtheHITMAN.)
406 bottom pipes. Im trying to do it properly ie brackets for pipes, propa routing. going to do the rest at work on a ramp... In the warmth, iv plumbed it all up to the rad just got a few joins then mounting the IC. Il post up some pics when if i figure out how!