06-10-2013, 07:49 PM
Yeah mini projects is defo the way forward, make a load of mini projects out of your one big problem and then prioritise them.
My 2.2 is broken down into sections each consisting of about 10-20 things so i have turbo project, beam project, box project, swirlflap/inlet project, bolting shit to the engine project and fitting engine to car project.
Also beer and somewhere warm and dry to work with music are such a morale boost so I'm loving my garage and its shit wind up radio.
My 2.2 is broken down into sections each consisting of about 10-20 things so i have turbo project, beam project, box project, swirlflap/inlet project, bolting shit to the engine project and fitting engine to car project.
Also beer and somewhere warm and dry to work with music are such a morale boost so I'm loving my garage and its shit wind up radio.