It wont be running in two weeks, weve got to wait at least 2.5 weeks to get the car to VVT, that will take a day or two... then its appointment making time for the trip to DP Engineering
Just called with Pieter from DP Engineering.. 18 july D-DAY!!!
Just called with Pieter from DP Engineering.. 18 july D-DAY!!!