25-04-2012, 05:31 PM
Soak the inch of water up that's appeared in the footwell.
Custom roll cages/shiny suspension bits/general fabrication work undertaken, PM me.
Top engine mount repair/reinforcement/chocking for cracked chassis and high powered cars, drive in, drive out, 2 hour turnaround.
Top engine mount repair/reinforcement/chocking for cracked chassis and high powered cars, drive in, drive out, 2 hour turnaround.