28-03-2016, 01:11 PM
This is now the start of the build. On the Saturday morning all the materials arrived including the insulation as the idea was that the temperature inside would be in a normal range. The old one would become a sauna in the summer.
![[Image: wNKUMTI.jpg]](https://i.imgur.com/wNKUMTI.jpg)
![[Image: wwQyHle.jpg]](https://i.imgur.com/wwQyHle.jpg)
And we're off! First bits going up.
![[Image: 5MuwIMl.jpg]](https://i.imgur.com/5MuwIMl.jpg)
![[Image: wNKUMTI.jpg]](https://i.imgur.com/wNKUMTI.jpg)
![[Image: wwQyHle.jpg]](https://i.imgur.com/wwQyHle.jpg)
And we're off! First bits going up.
![[Image: 5MuwIMl.jpg]](https://i.imgur.com/5MuwIMl.jpg)
![[Image: z8jGbYW.jpg]](https://i.imgur.com/z8jGbYW.jpg)