I'm certainly getting there.
So I've knocked a load off that list and added fit new wishbones, change tyre and smooth roof.
List now stands at (in order of importance):
Fix fuel tank leak (new seal and lock ring)
Fit wishbones and partner P-bushes (just need new pinch bolts)
Fit new NSF driveshaft (split CV boot)
Fit passenger bucket (need a bit of sheet steel)
Clean grinding dust off car (probably the next job)
Make rev counter work (needs alot of electrical testing)
Paint the odd hockey stick (need a dry day)
Switch to 10mm lines and truck filter (all needs buying)
Smooth roof (need filler)
Change OSF tyre (spare in garage)
Potentially less than a days work there, just need money for parts.
oh and MUST BUY A TRACK DAY LID!!!!!!
(01-05-2014, 07:04 PM)Dum-Dum Wrote: Fit FMIC, fit passenger bucket, fit ph1 rad and lower hose remove rear thermostat, fit fan, make rev counter work, put grub screws in roof, stop leaks through roof, fix fuel tank leak, put dehumidifier in car, refit front end without cable ties.
Just a little list lol
If I could get the rad and lower hose done Id actually have some motivation to do the rest.
So I've knocked a load off that list and added fit new wishbones, change tyre and smooth roof.
List now stands at (in order of importance):
Fix fuel tank leak (new seal and lock ring)
Fit wishbones and partner P-bushes (just need new pinch bolts)
Fit new NSF driveshaft (split CV boot)
Fit passenger bucket (need a bit of sheet steel)
Clean grinding dust off car (probably the next job)
Make rev counter work (needs alot of electrical testing)
Paint the odd hockey stick (need a dry day)
Switch to 10mm lines and truck filter (all needs buying)
Smooth roof (need filler)
Change OSF tyre (spare in garage)
Potentially less than a days work there, just need money for parts.