10-09-2013, 07:24 PM
All this time? 4 weeks between full time, social times, family events and collecting partsI don't think we've done bad at all.
Anyone wanting dibs on the engine pm a price. Need to recover as much as possible to make up for the costs
Anyone wanting dibs on the engine pm a price. Need to recover as much as possible to make up for the costs
Phaes 1 GTI 6 - Onyx Black
