23-06-2013, 06:00 PM
Believe it or not this project is still going, has to be longest running project with very few changes but, the further i go the more i end up doing,.
What was going to be a drill the sump in situ turned into a remove the engine/ remove the sump, remove and uprate the clutch, changed some oil seals, replace bearing and slave cylinder, and clean all the muck off the engine.
Now its back in with a stage 3 clutch which should be good for 200bhp easy. Now all thats left is to fit the ecu and the panels.
What was going to be a drill the sump in situ turned into a remove the engine/ remove the sump, remove and uprate the clutch, changed some oil seals, replace bearing and slave cylinder, and clean all the muck off the engine.
Now its back in with a stage 3 clutch which should be good for 200bhp easy. Now all thats left is to fit the ecu and the panels.
![[Image: 2013-06-20210046_zps5881871a.jpg]](http://i24.photobucket.com/albums/c12/fozzy_255/2013-06-20210046_zps5881871a.jpg)
![[Image: 306oc_zpsf2d249a4.jpg]](http://i24.photobucket.com/albums/c12/fozzy_255/MX5/306oc_zpsf2d249a4.jpg)