20-02-2013, 07:59 PM
What, really? As in 2.25" with squash bends a cat, midbox and backbox...?
CP1 control is after the pump, it's a bleed-style control system, the FPR being the bleed valve actuator. Does that even make any sense? :S
Don't like the mention of ecm, how exactly are we going to work with that? Would need a dedicated map table or two, surely..?
CP1 control is after the pump, it's a bleed-style control system, the FPR being the bleed valve actuator. Does that even make any sense? :S
Don't like the mention of ecm, how exactly are we going to work with that? Would need a dedicated map table or two, surely..?