06-09-2017, 08:25 PM
(06-09-2017, 08:04 PM)Doseph Wrote: Bash showed at the farm, got the engine started in 25 minutes (cheated) and wired up in an about an hour.
and apparently this isn't all he's quick at!
It ran it 25 mins didnt it? just with a power probe on the stop solinoid. Glad this is getting there. almost ready for mot as well.
On a break from 306oc for personal reasons. If anyone needs or wants me most of you have my number and or facebook messenger
Thanks for the good times guys n gals. I might be back. Who knows.
Thanks for the good times guys n gals. I might be back. Who knows.