12-05-2016, 12:25 PM
Safety Devices Roll cage ordered. Thats the cage in standard powder coated black with the upgrade of X and harness bars. Its a 6 week lead time so wont even be delivered before FCS but will hopefully be fitted before pugfest.
Heater matrix is being replaced next week. Its a slow leak but it is a leak none the less and needs to be done before the cage is fitted as the cage will have to be removed to get the dash out in the future!
Tom has got me some pug gearbox oil so will swap that out. No idea how much is in there at the moment.
Im currently trying to find some generally good 5.1 fluid to swap out the old dot4. And im still on the verge of buying some ds2500 pads.
Heater matrix is being replaced next week. Its a slow leak but it is a leak none the less and needs to be done before the cage is fitted as the cage will have to be removed to get the dash out in the future!
Tom has got me some pug gearbox oil so will swap that out. No idea how much is in there at the moment.
Im currently trying to find some generally good 5.1 fluid to swap out the old dot4. And im still on the verge of buying some ds2500 pads.